Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Plainfield    
Tristan MacGregor-Stewart Chief Operator    
Town of Plainfield    
Plainfield Wastewater Treatment Facility    
07/10/2023    
07/11/2023    
07:30 pm to 01:00 pm    
   
Discharged untreated sewage    
>100,000 to 500,000 gallons    
High Flows    
Massive flooding incident    
WWTF outfall    
As soon as water levels receded to manageable levels the flow was no longer diverted and is running through the facility and disinfection in a more normal fashion.    
Winooski River    
Tristan MacGregor-Stewart    
   
   
nForms    
Y    
   
   
   
High flows caused by heavy on going rain outpaced the capacity of the treatment facility. In order to protect the integrity of the wastewater treatment facility and the infrastructure and equipment inside of it the incoming influent was diverted into the river until water levels dropped enough to return to more normal operations.    
   
HPW-3QJC-DWNHP