Facility Name: North Troy    
Karson McMahon Chief Operator    
North Troy    
Elkins Road In front of wastewater plant    
12/14/2025    
12/15/2025    
12:00 pm to 09:00 am    
   
Discharged untreated sewage    
35000    
Obstruction/Blockage    
debris    
Manhole    
The manhole was pumped down directly into headworks so we could get snake into main. a smaller one was used at first with no success. Larger snake was brought out and temporarily opened up line. shortly after the line plugged up again. multiple snaking from both directions were unsuccessful. Eventually we called Juddys Septic pumping to assist and were able to such out obstruction into pump truck and then discharged into WW plant. I contacted The Town Health Officer and reported to him. The placement of signs was deemed unnecessary due to cold temperatures and ice prohibiting people from swimming.    
Missisquoi river    
Karson McMahon Chief Operator    
   
   
nForms    
Y    
   
   
   
Main line became obstructed on Sunday around noon (based on flow chart). Back up and discharge was not discovered until about 730 AM Monday    
   