Facility Name:
|
Newport City
|
|
|
Jason Herman
|
|
|
City of Newport
|
|
|
WWTF
|
|
|
04/21/2024
|
|
|
04/21/2024
|
|
|
10:00 am to 03:00 pm
|
|
|
|
|
|
Other
|
|
|
>100,000 to 500,000 gallons
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
The valves were closed and fire hoses were used to clean up the sludge tank and surrounding lawn area.
|
|
|
Clyde River
|
|
|
Jason Herman Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A valve from our sludge storage tank was left open by an employee after filling a smaller sludge tank. It is estimated that approximately 100,000-125,000 gallons of sludge overflowed out of the smaller tank into a catch basin. The discharge pipe from the basin empties into a drainage ditch roughly 200ft long before entering the Clyde river.
|
|
|
|
|
|
HQ3-29RC-BWF5Y
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|