Facility Name:
|
Newport City
|
|
|
Donald Grondin Chief operator
|
|
|
City of Newport
|
|
|
Bluff road pump station
|
|
|
11/01/2019
|
|
|
11/01/2019
|
|
|
02:00 pm to 04:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
none
|
|
|
Combined sewer overflow structure
|
|
|
brought in vacuum tanker to help keep up with flows until the rain slowed and pumps could keep up with flow
|
|
|
Lake Memphremagog
|
|
|
Donald Grondin Chief operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Rain fall had started on Oct 31 on Nov 1 at 2:00 am the high level alarm alert the on call operator of a problem when the operator arrive observed that the flow was so high coming in that the two pumps where not keeping up with the flows so we had an overflow the operator than brought in the city vacuum tank to help the pumps keep up with the vacuum tanker and pumps where able to keep up and stop the over flow the incident last rough fully two hours from the time the operator was notified tt the problem was fixed
|
|
|
|
|
|
HNV-15PR-M4HYE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|