Facility Name:
|
Manchester
|
|
|
Eric Severance, Chief Operator
|
|
|
Manchester
|
|
|
Richville Road/New Form Way
|
|
|
07/31/2021
|
|
|
07/31/2021
|
|
|
04:00 am to 02:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Pump station emergency overflow pipe
|
|
|
The owners contracted a septic hauling company to pump and move surplus flow to treatment plant. Worked to eliminate sources of inflow and infiltration. Work continues today to attempt to locate more sources, and check to ensure homeowners are not contributing with sump pumps connected to their sewer services. Town personnel has been and is assisting.
|
|
|
Battenkill River
|
|
|
John OKeefe, Town Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
An intense rain storm during evening of July 29, 2021 resulted in a rapid rise of rivers and groundwater, causing flash flooding throughout town. This caused surcharging and overflow of a privately owned sewer pump station on Richville Road. There were no mechanical failures. The pumps just could not keep up with influent rush of flood and groundwater.
|
|
|
|
|
|
HPA-NP4R-B3W3S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|