Facility Name:
|
Manchester
|
Caller Name And Title:
|
Eric Severance Chief Operator
|
Municipality:
|
Town of Manchester
|
Location (street or site):
|
Depot Street
|
Incident Start Date:
|
01/24/2019
|
Incident End Date:
|
01/24/2019
|
Incident Start End Times:
|
10:00 am to 07:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
gallons
|
Cause Of Discharge:
|
Other
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Manhole
|
Corrective Action Taken:
|
Monitor, and maintain sewer systems and pump stations until flooding event passed.
|
Waterbody Impacted:
|
Battenkill River
|
Contact Name And Title For Public:
|
John Okeefe, Town Manager
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by intense rain and flooding on January 24, 2019 resulted in the surecharging and overflow of a main sewer trunk line on Depot Street.
|
|
|
nForm Submission Number:
|
HNM-2EFX-HD28B
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|