Facility Name:
|
Lunenburg FD2
|
|
|
Rodger Sheldon Chief Operator
|
|
|
Lunenburg FD #2
|
|
|
Pump Station
|
|
|
10/14/2026
|
|
|
10/14/2026
|
|
|
05:00 am to 08:00 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
1000
|
|
|
Mechanical Failure
|
|
|
|
|
|
Pump station emergency overflow pipe
|
|
|
Parts ordered and should be onsite 10/15. Controls tech to be on site 10/15 to diagnose why lag pump did not start. Report to be left open until repairs are made but at this point station is operating on 1 pump. Notified at 4:00 PM 10/15/2026 that repairs have been made and both pumps are working as designed.
|
|
|
Connecticut River
|
|
|
Rodger Sheldon Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Lead pump failed due to vacuum hose defect. Lag pump failed to start. Lag pump is running and parts ordered to repair pump 1.
|
|
|
|
|
|
HQS-9XY7-JSKEJ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|