Facility Name:
|
Lunenburg FD2
|
Caller Name And Title:
|
Richard Mullen
|
Municipality:
|
LFD#2
|
Location (street or site):
|
Gilman Main Pump Station, Treatment Plant Rd
|
Incident Start Date:
|
03/31/2019
|
Incident End Date:
|
03/31/2019
|
Incident Start End Times:
|
02:30 pm to 11:10 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
>100,000 to 500,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
Monitored flows and reported incident
|
Waterbody Impacted:
|
Connecticut
|
Contact Name And Title For Public:
|
Richard Mullen
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
We had an exceptionally large melting day along with heavy rain. With the return of colder temps and lack of rain the pump station is operating within it's design condition.
|
|
|
nForm Submission Number:
|
HNN-PP8E-4TF58
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|