|
Facility Name:
|
Jeffersonville
|
|
|
Trevor Welch
|
|
|
Jeffersonville
|
|
|
Old Main St
|
|
|
02/27/2017
|
|
|
02/27/2017
|
|
|
01:00 am to 12:30 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>100 to 1,000 gallons
|
|
|
Obstruction/Blockage
|
|
|
Grease
|
|
|
Manhole
|
|
|
I removed the nearest manhole cover downstream of the plug and hired JR Young to use a jetter to break up the clog. Once the grease was broken up, all the backed up wastewater went to the pump station.
|
|
|
Brewster River
|
|
|
Trevor Welch - Head Water and Wastewater Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Collection system became clogged with grease and overflowed at a manhole. The untreated wastewater went about 20' away from the manhole, into a storm drain.
|
|
|
|
|
|
2PN-HC2M-0RF2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|