Facility Name:
|
Jeffersonville
|
Caller Name And Title:
|
Trevor Welch - Head Water/Wastewater Operator
|
Municipality:
|
Jeffersonville
|
Location (street or site):
|
Lamoille River, just downstream from the Rt 15 bridge heading out of Jeffersonvi
|
Incident Start Date:
|
02/05/2017
|
Incident End Date:
|
02/06/2017
|
Incident Start End Times:
|
05:00 pm to 07:35 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
>1,000 to 10,000 gallons
|
Cause Of Discharge:
|
Mechanical Failure
|
Type Of Obstruction:
|
Rags
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
I immediately called JR Young and had him send a pump truck. We reset the breaker for the one that had tripped out. Phil Laramie and I pulled both pumps and cleaned them. Both were spinning freely and ran when we bump tested them on the back of the trailer. We are planning on replacing the older pump and the electrical panel this year.
|
Waterbody Impacted:
|
Lamoille River
|
Contact Name And Title For Public:
|
Trevor Welch - Head Water/Wastewater Operator
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
One of our pumps tripped their breaker and turned off. The other pump should have been able to keep up, but may have been partially or completely clogged too.
|
|
|
nForm Submission Number:
|
2P5-19HW-NYW4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|