|
Facility Name:
|
Fair Haven
|
|
|
Carrie LaFond- Chief Operator
|
|
|
Fair Haven
|
|
|
Adam St Pump Station
|
|
|
05/10/2025
|
|
|
05/10/2025
|
|
|
04:30 am to 09:30 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
25000
|
|
|
High Flows
|
|
|
none
|
|
|
Pump station emergency overflow pipe
|
|
|
Waited for flow to subside
|
|
|
castleton River
|
|
|
Joe Gunther
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The Pump Station had an excess flow of 2.82 inches of rain. Both pumps pumping continuously could not keep up.
|
|
|
|
|
|
HQC-FQ51-WN7RB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|