Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Fair Haven    
Caller Name And Title: Carrie LaFond- Chief Operator    
Municipality: Fair Haven    
Location (street or site): Adam St Pump Station    
Incident Start Date: 05/10/2025    
Incident End Date: 05/10/2025    
Incident Start End Times: 04:30 am to 09:30 am    
Estimated Duration Of Event:    
Nature Of Incident: Discharged untreated sewage    
Estimated Volume (gallons): 25000    
Cause Of Discharge: High Flows    
Type Of Obstruction: none    
Point Of Discharge: Pump station emergency overflow pipe    
Corrective Action Taken: Waited for flow to subside    
Waterbody Impacted: castleton River    
Contact Name And Title For Public: Joe Gunther    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: The Pump Station had an excess flow of 2.82 inches of rain. Both pumps pumping continuously could not keep up.    
   
nForm Submission Number: HQC-FQ51-WN7RB