View FacilityIncident Record


Facility Name: Fair Haven    
Carrie LaFond Chief Operator    
Town of Fair Haven    
193 Montgiven Ave Fair Haven VT    
11/02/2022    
11/03/2022    
03:30 pm to 05:00 am    
   
Discharged treated and partly disinfected effluent    
>10,000 to 100,000 gallons    
Mechanical Failure    
   
WWTF outfall    
Coupling was replaced. Chlorine was added both manually and with the pump being turned up. This took approximately 20 minutes. The chlorine residual went from a .08 to a .75 within 1 hr. The lines are going to be changed from the 1/2 that the contractor installed to the original 3/8 that fit the pumps properly so that we do not need any reducing couplers.    
Castleton River    
Joe Gunther Town Manager    
   
   
nForms    
Y    
   
   
   
Construction workers moved barrels resulting in a coupling coming loose. Effluent only had partial disinfection due to some of the chlorine leaking out of a fitting into the overflow container.    
   
HPN-XMPD-8ABF1