Facility Name:
|
Fair Haven
|
|
|
Carrie LaFond Chief Operator
|
|
|
Town of Fair Haven
|
|
|
193 Montgiven Ave Fair Haven VT
|
|
|
11/02/2022
|
|
|
11/03/2022
|
|
|
03:30 pm to 05:00 am
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>10,000 to 100,000 gallons
|
|
|
Mechanical Failure
|
|
|
|
|
|
WWTF outfall
|
|
|
Coupling was replaced. Chlorine was added both manually and with the pump being turned up. This took approximately 20 minutes. The chlorine residual went from a .08 to a .75 within 1 hr. The lines are going to be changed from the 1/2 that the contractor installed to the original 3/8 that fit the pumps properly so that we do not need any reducing couplers.
|
|
|
Castleton River
|
|
|
Joe Gunther Town Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Construction workers moved barrels resulting in a coupling coming loose. Effluent only had partial disinfection due to some of the chlorine leaking out of a fitting into the overflow container.
|
|
|
|
|
|