Facility Name:
|
Fair Haven
|
|
|
Peter Laramie, Chief Operator
|
|
|
Fair Haven
|
|
|
Fair Haven WWTF
|
|
|
07/15/2018
|
|
|
07/16/2018
|
|
|
01:00 pm to 05:35 am
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>10,000 to 20,000 gallons
|
|
|
Chem Feed Problem
|
|
|
|
|
|
WWTF outfall
|
|
|
I pumped off a quantity of hypochlorite and liberally disbursed that by hand throughout the chlorine contact tank beginning at the end. I then replaced the internal tubing of the peristaltic pump and ran the pump on high speed for several minutes until the chemical was reaching the contact tank. The entire process took about 15 minutes.
|
|
|
Castleton River
|
|
|
Peter Laramie
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Late morning/early afternoon 7/15/2018 the hypochlorite pump stopped taking up chemical, but continued to discharge the chemical in the discharge line for at least two hours. Due to very low flows the treated but partially disinfected and partially undisinfected wastewater was still in the large chlorine contact tank when I found the problem at 5:22 a.m. on 7/16.
|
|
|
|
|
|