Facility Name:
|
Fair Haven
|
|
|
Peter Laramie
|
|
|
Fair Haven
|
|
|
Fair Haven Wastewater Treatment Facility
|
|
|
02/09/2018
|
|
|
|
|
|
01:00 am to 09:16 am
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>10,000 to 100,000 gallons
|
|
|
Chem Feed Problem
|
|
|
|
|
|
WWTF outfall
|
|
|
When the operator arrived and discovered the problem he immediately reconnected the tubing and reprimed the pump. Hypochlorite has been added manually to different sections of the chlorine contact tank to get chlorine into the system as quickly as possible. Checking the tightness of the connections at the pump will be added to daily checks in the future.
|
|
|
Castleton River
|
|
|
Peter M. Laramie
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The nut securing the chemical suction tubing to the hypochlorite pump had become loose due to vibration causing an air gab between the tubing and the pump.
|
|
|
|
|
|
HNB-FRXM-W9QNJ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|