|
Facility Name:
|
Fairfax
|
|
|
Brent Sheets Director of Public Works
|
|
|
Town of Fairfax
|
|
|
Wastewater Treatment Plant 142 Hunt Street Fairfax, VT
|
|
|
03/26/2025
|
|
|
03/27/2025
|
|
|
09:00 pm to 09:00 am
|
|
|
|
|
|
Other
|
|
|
54000
|
|
|
Other
|
|
|
None
|
|
|
WWTF outfall
|
|
|
On 03/27/2025 Lab samples showed E. coli was at 2.0 MPN/100mL. TRC concentration was at 1.52 at the time of collection.
|
|
|
Lamoille River
|
|
|
Brent Sheets Director of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
On 03/26/2025 Lab samples showed E. coli was at 727.0 MPN/100m, TRC concentration was at 0.77 at the time of collection.
|
|
|
|
|
|
HQB-CS82-FP55X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|