Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Enosburg Falls    
Brian Ovitt Chief Operator    
Enosburg Falls    
Route 108 Bridge    
07/21/2023    
07/22/2023    
05:38 pm to 01:33 am    
   
Authorized Wet Weather CSO Overflow    
>1,000 to 10,000 gallons    
High Flows    
None    
Combined sewer overflow structure    
None    
Missisquoi River    
John Dasaro Village Manager    
   
   
nForms    
Y    
   
   
   
High flows caused by 3.8 inches of rain most of which occurred in less than an hour. We were already experiencing elevated flows due to previous storms and grounds were saturated.    
   
HPW-AMMM-8VSSX