Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Chelsea    
Caller Name And Title: Mike Whipple cheif operator    
Municipality: chelsea    
Location (street or site): outfall of waste water treatment plant    
Incident Start Date: 06/03/2025    
Incident End Date: 06/04/2025    
Incident Start End Times: 01:55 pm to 11:20 am    
Estimated Duration Of Event:    
Nature Of Incident: Discharged partially treated disinfected effluent    
Estimated Volume (gallons): 27000    
Cause Of Discharge: Chem Feed Problem    
Type Of Obstruction:    
Point Of Discharge: WWTF outfall    
Corrective Action Taken: increased pump rate and mixed up fresh chlorine solution    
Waterbody Impacted: first branch of white river    
Contact Name And Title For Public: mike whipple chief operator    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: low chlorine residual do to increasing air temp and low pump application rate. The failed E.coli sample was taken at 1:55pm on 6/3/25 and the TRC was 0.27. The second E.coli sample was taken at 11:20am on 6/4/25 and had a TRC of 0.52. The second sample had a result of <1. The total amount discharge during this period was roughly 27000 gallons.    
   
nForm Submission Number: HQD-3FVF-BZYJX