Facility Name:
|
Brandon
|
|
|
Stephen J. Cijka Chief Wastewater Operator
|
|
|
Town of Brandon
|
|
|
Wastewater Plant
|
|
|
03/18/2024
|
|
|
|
|
|
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>500,000 to 1,000,000 gallons
|
|
|
Unknown
|
|
|
None
|
|
|
WWTF outfall
|
|
|
Thoroughly washed hands and put on a clean pair of gloves before sampling. Sampled on March 19 , 2024 at 900 am . The flow was 478,000 gallons per day the turbidity was 3.2 NTU the chlorine tank had 5.80 mg/l in it and the dechlorination tank had .02 mg/l.
|
|
|
Neshobe River
|
|
|
Stephen J. Cijka Chief Wastewater Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
At 655 am March 18 , 2024 grabbed an e coli sample. The instantaneous flow was 496,000 gallons per day with a turbidity of 6.8 NTU and a chlorine tank residual of 4.40 mg/l and a dechlorination tank residual of 0 mg/l. The resulting e coli count was 866.4 /100ml.
|
|
|
|
|
|
HQ2-8VH4-S016A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|