Facility Name:
|
Brandon
|
|
|
stephen j cijka
|
|
|
town of brandon
|
|
|
outfall at brandon wastewater to neshobe river
|
|
|
07/10/2023
|
|
|
07/11/2023
|
|
|
05:00 pm to 09:43 pm
|
|
|
|
|
|
Discharged partially treated disinfected effluent
|
|
|
>1,000,000 gallons
|
|
|
High Flows
|
|
|
none
|
|
|
WWTF outfall
|
|
|
at 5 pm on 7/10/2023 Tim Kingston shut off both aerators to contain the solids in the wastewater plant with high flows getting progressively worst and the two secondary clarifiers overflowing the tops of their weir boxes.
|
|
|
neshobe river
|
|
|
Stephen Cijka Chief Wastewater Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
total daily flow on 7/9/2023 was 244,000 gallons with1.81 inches rainfall and total daily flow on 7/10/2023 was 3,000,004 gallons so heavy rainfall with infiltration and inflo contributed to an imminent solids loss without shutting aeration off.
|
|
|
|
|
|
HPW-202Q-DJAH6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|