Facility Name:
|
Brandon
|
Caller Name And Title:
|
Stephen Cijka
|
Municipality:
|
Town of Brandon
|
Location (street or site):
|
Wastewater plant outfall
|
Incident Start Date:
|
01/24/2019
|
Incident End Date:
|
01/26/2019
|
Incident Start End Times:
|
08:30 am to 02:30 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged partially treated disinfected effluent
|
Estimated Volume (gallons):
|
>1,000,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
none
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
aeration shut off to prevent solids overflow/ phosphorus removal chemical dosage doubled for sodium aluminate/ sodium hypochlorite and sodium bisulfite dosage raised 50%/ other aeration basin was put on line also
|
Waterbody Impacted:
|
Neshobe River
|
Contact Name And Title For Public:
|
David Atherton Town Manager
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Flows exceeded design flow of 700,000 gallons per day for approximately two days due to rain water, ground water, snow melt,roof drains, and sump pumps feeding into wastewater system
|
|
|
nForm Submission Number:
|
HNM-3NKS-MQVQ0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|