Facility Name:
|
Brandon
|
Caller Name And Title:
|
Tim Kingston ACO
|
Municipality:
|
Brandon
|
Location (street or site):
|
WWTP
|
Incident Start Date:
|
12/22/2018
|
Incident End Date:
|
12/23/2018
|
Incident Start End Times:
|
11:30 am to 11:30 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Other
|
Estimated Volume (gallons):
|
>500,000 to 1,000,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
Adjusted for high chlorination dosage. Ongoing monitoring throughout high flow event
|
Waterbody Impacted:
|
Neshobe river
|
Contact Name And Title For Public:
|
Tim Kingston 802-247-6730
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Heavy rain, snow melt and flooding conditions. Inflow into WWTP has exceeded maximum designed capacity. Aeration stopped to help contain solids mass. No loss of chlorination disinfection treatment.
|
|
|
nForm Submission Number:
|
HNK-85A7-JV8AB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|