|
Facility Name:
|
Brandon
|
|
|
Stephen Cijka Chief Wastewater Operator
|
|
|
Town of Brandon
|
|
|
Wastewater Effluent at 500 Union Street
|
|
|
04/04/2018
|
|
|
04/05/2018
|
|
|
03:15 pm to 07:15 pm
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>1,000,000 gallons
|
|
|
Chem Feed Problem
|
|
|
none
|
|
|
WWTF outfall
|
|
|
Pipe was repaired early Thursday evening and the flow went down immediately. Also the aeration was turned on after flow went back down to plant so secondary treatment could be resumed.
|
|
|
Neshobe River
|
|
|
Stephen Cijka Chief Wastewater Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flow due to broken sewer pipe at bottom land of Mill Street and Conant Square next to the Neshobe River took in a 12 inch pipe of river water that overwhelmed the disinfection system at present flow proportioning setting. Although a 2.4 mg/l chlorine residual was recorded leaving the chlorine contact chamber the e coli was 220/100ml.
|
|
|
|
|
|
HNC-WKJ7-53W7K
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|