Facility Name:
|
Brandon
|
|
|
Stephen Cijka Chief Wastewater Operator
|
|
|
Town of Brandon
|
|
|
Bottom land Mill Street and Conant Square next to Neshobe River
|
|
|
04/04/2018
|
|
|
04/05/2018
|
|
|
03:15 pm to 07:15 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>100,000 to 500,000 gallons
|
|
|
Other
|
|
|
none
|
|
|
Other
|
|
|
The bypass pump and its hose was ordered by 10 am and the iron pipe has been ordered that will reduce the chances of floating out of position and the stream alterations division has been contacted along with E&D Miner excavating to repair.
|
|
|
Neshobe River
|
|
|
Stephen Cijka Chief Wastewater Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The 30 feet of polyethylene pipe that was replaced earlier this year at this spot broke away from its couplings due to the river water overflowing its bank at that spot and floating the pipe up and out of its couplings and into the water downstream.
|
|
|
|
|
|