Facility Name:
|
Brandon
|
Caller Name And Title:
|
Stephen Cijka Chief Wastewater Operator
|
Municipality:
|
Town of Brandon
|
Location (street or site):
|
Bottom land between Mill Lane and Conant Square
|
Incident Start Date:
|
02/22/2018
|
Incident End Date:
|
03/07/2018
|
Incident Start End Times:
|
03:15 am to 12:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
>1,000,000 gallons
|
Cause Of Discharge:
|
Crack/Hole in Pipe
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Other
|
Corrective Action Taken:
|
REpresentative from Vermont Rural Water went with my assistant and found problem March 6. Assistant called public works director. Public works director called stream alterations ANR and local contractor .Also Godwin Pump called to bring 200 feet suction hose,400 feet discharge hose, and 6 inch self prime pump to pump between manholes. River water stopped going into sewer main. 40 feet hdpe pipe ordered
|
Waterbody Impacted:
|
Neshobe River
|
Contact Name And Title For Public:
|
Stephen Cijka Chief Wastewater Operator
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
12 inch ac pipe broke in 2 places along river between manholes
|
|
|
nForm Submission Number:
|
HNC-47C5-7KMTA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|