Facility Name:
|
Bethel
|
|
|
Timothy Mills Utility Director
|
|
|
Town of Bethel
|
|
|
Lower Church St.
|
|
|
10/18/2021
|
|
|
10/21/2021
|
|
|
12:30 pm to 07:30 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
22981 gal. approx.
|
|
|
Obstruction/Blockage
|
|
|
grease in one chamber, backup chamber ha
|
|
|
Other
|
|
|
Contacted a vactor truck and cleared the grease blockage and removed the newly discovered plug in the #2 river siphon.
|
|
|
Third branch of the White River.
|
|
|
Timothy Mills Utility Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
there was a build up of grease that appeared to have been released in the sewer line eventually becoming built up at the #1 river siphon chamber. The #2 river siphon chamber had a plug that was installed which was suspected to prevent the contractor from losing tools down the siphon chamber during construction. The calculated wastewater loss was taken from flow chart readings at the wastewater plant over a 3 day period. The lost wastewater was released through an overflow installed in the river siphon manhole.
|
|
|
|
|
|
HPC-NEC1-S7C5R
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|