Facility Name:
|
Brighton
|
|
|
Kean Galunas Chief Operator
|
|
|
Brighton
|
|
|
Brighton WWTF outfall
|
|
|
04/16/2026
|
|
|
04/22/2026
|
|
|
08:52 am to 07:30 am
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
416000
|
|
|
Other
|
|
|
|
|
|
WWTF outfall
|
|
|
Flow was temporarily reduced to a level that was previously providing adequate treatment and then increased by a smaller rate than was first attempted. Chlorination rate was also increased, and this combination brought the e. coli measurement below the public notification level. (Note: Total volume is necessarily calculated as the flow measured between the initial and follow up e. coli tests and may not represent the true duration of the event.)
|
|
|
Pherrins River
|
|
|
Kean Galunas Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
An increase in the effluent pumping rate to draw down the lagoons for construction work reduced the detention time in the chlorine contact tank. The chlorine residual of .93 mg/l proved inadequate for effective disinfection, with an e. coli test result of 248.1 MPN/100mL.
Public notification is required for results above 235.
|
|
|
|
|
|
HQM-WPJB-XP8ZP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|