View FacilityIncident Record


Facility Name: Brighton    
Kean Galunas Chief Operator    
Brighton    
Pherrins River    
08/20/2025    
08/27/2025    
07:22 pm to 07:24 am    
   
Discharged treated and partly disinfected effluent    
517000    
Other    
   
WWTF outfall    
Flow rates had already been reduced shortly after the first sample had been taken. Chlorination was also being increased at the same time.    
Pherrins River    
Kean Galunas Chief Operator    
   
   
nForms    
Y    
   
   
   
Lagoon dewatering ahead of excavation for the replacement chlorine contact tank required increased flow through the existing contact tank, and that combined with increasing chlorine demand led to an e. coli test result on August 20th of 300 MPN/100 ml, which is over the public notification threshold of 235. A retest on August 27th yielded a result of 7 MPN/100 ml. Total volume was necessarily calculated from the flow between the two successive tests and not the true duration of the incident.    
   
HQF-0TB7-NB97M