Waste Water Inventory Website
GoTo=>             Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record

Skip Navigation Links

Facility Name: Brighton    
Caller Name And Title: Kean Galunas Chief Operator    
Municipality: Brighton    
Location (street or site): Outfall    
Incident Start Date: 04/02/2025    
Incident End Date: 04/16/2025    
Incident Start End Times: 07:20 am to 07:14 am    
Estimated Duration Of Event:    
Nature Of Incident: Discharged treated and partly disinfected effluent    
Estimated Volume (gallons): 1537000    
Cause Of Discharge: Other    
Type Of Obstruction:    
Point Of Discharge: WWTF outfall    
Corrective Action Taken: The chlorination rate was increased, and a follow up e. coli test was performed on 09 Apr. That result was 240 MPN/100 ml, which was still over the 235 public notification level. Another sample taken on 16 Apr had a result of 21 MPN/100 ml, allowing this notification to be closed.    
Waterbody Impacted: Pherrins River / Clyde River    
Contact Name And Title For Public: Kean Galunas Chief Operator    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: Recent rains and spring runoff reduced detention time in the chlorine contact tank, hindering efforts to achieve adequate disinfection. An e. coli test conducted on 02 Apr showed a result of 1100 MPN/100 ml, triggering public notification.    
   
nForm Submission Number: HQB-JTJ4-JWT1V