Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Brighton    
Kean Galunas Chief Operator    
Brighton    
Cross St, Island Pond    
03/05/2022    
03/05/2022    
08:00 am to 10:30 am    
   
Discharged untreated sewage    
>100 to 1,000 gallons    
Crack/Hole in Pipe    
   
Stormwater collection system    
Pump station shut down approximately 10:30 am with septic hauler called in to bypass station for the duration of excavation and force main repair.    
Clyde River    
Rodger Sheldon - Project Manager Brighton WWTF    
   
   
nForms    
Y    
   
   
   
Force main break surfacing and going into storm drain    
   
HPF-YQ4T-FJZJ8