|
Facility Name:
|
Vergennes
|
|
|
Dan Flynn Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Dr Pump station CSO Structure #002
|
|
|
06/18/2026
|
|
|
06/18/2026
|
|
|
02:00 pm to 04:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
52600
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Dan Flynn Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rainstorm on June 18th resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
Total Rainfall was 1" over 2 hours
|
|
|
|
|
|
HQP-DEY4-P1HDV
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|