|
Facility Name:
|
Vergennes
|
|
|
Dan Flynn Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Dr pump station CSO structure #002
|
|
|
05/25/2026
|
|
|
05/25/2026
|
|
|
07:40 am to 09:40 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
19300
|
|
|
High Flows
|
|
|
NA
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Dan Flynn Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 05/25/2026resulted in the discharge of a combination of sewage and stormwater from CSO Structure #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQN-TCCY-HAHV3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|