View FacilityIncident Record


Facility Name: Vergennes    
Dan Flynn Asst Operator    
CIty of Vergennes    
Macdonough Dr Pump Station CSO Structure #002    
04/19/2026    
04/19/2026    
01:40 pm to 03:30 pm    
   
Authorized Wet Weather CSO Overflow    
8900    
High Flows    
   
Combined sewer overflow structure    
None    
Otter Creek    
Dan Flynn Assistant Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on April 19th 2026 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Rain Fall was 0.60 inches over 12 hours    
   
HQM-YAYV-D1D60