|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Dr. Pump Station
|
|
|
04/16/2026
|
|
|
04/17/2026
|
|
|
09:00 pm to 10:30 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
814400
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on April 16th 2026 resulted in the discharge of a combination of sewage and stormwater from CSO#002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQM-WKSD-TMFX2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|