|
Facility Name:
|
Vergennes
|
|
|
Dan Flynn Asst Operator
|
|
|
City Of Vergennes
|
|
|
Maconough Dr Pump Station CSO Structure #002
|
|
|
03/07/2026
|
|
|
03/08/2026
|
|
|
05:30 pm to 08:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
55000
|
|
|
High Flows
|
|
|
NA
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Dan Flynn Asst Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows Caused by rapid Snow melt on 03/07/2026 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQK-X2FF-XZCVD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|