|
Facility Name:
|
Vergennes
|
|
|
Dan Flynn Asst Operator
|
|
|
City of Vergennes
|
|
|
MacDonough Dr pump station CSO Structure #002
|
|
|
03/08/2026
|
|
|
03/08/2026
|
|
|
04:00 pm to 05:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
3200
|
|
|
High Flows
|
|
|
NA
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Dan Flynn Asst Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense Snow melt on 3/8/2026 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQK-XSCH-YEF19
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|