Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Vergennes    
Dan Flynn Asst Operator    
City of Vergennes    
MacDonough Dr pump station CSO Structure #002    
03/08/2026    
03/08/2026    
04:00 pm to 05:30 pm    
   
Authorized Wet Weather CSO Overflow    
3200    
High Flows    
NA    
Combined sewer overflow structure    
None    
Otter Creek    
Dan Flynn Asst Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense Snow melt on 3/8/2026 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HQK-XSCH-YEF19