View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput Chief Operator    
City Of Vergennes    
Macdonough Dr. Pump Station CSO Structure #002    
10/31/2025    
10/31/2025    
08:30 am to 04:00 pm    
   
Authorized Wet Weather CSO Overflow    
249500    
High Flows    
NA    
Combined sewer overflow structure    
None    
Otter Creek    
Rick Chaput Chief Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on October 31, 2025 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Total Rainfall was 1.80" over 12 hours    
   