|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
CSO #002, Macdonough Dr. Lift Station
|
|
|
08/19/2024
|
|
|
08/19/2024
|
|
|
03:00 pm to 05:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
18000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on August 19th, 2024 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ6-13E3-2RGJ3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|