|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Drive Lift Station CSO#002
|
|
|
04/12/2024
|
|
|
04/12/2024
|
|
|
05:10 pm to 10:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
468,600 gal
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 4/12/24 resulted in the discharge of a combination of sewage and stormwater from CSO (insert CSO number 002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
0.96" rain in 5hrs
|
|
|
|
|
|
HQ2-VRMD-EWN10
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|