|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
SSO Outfall #2
|
|
|
12/23/2022
|
|
|
12/23/2022
|
|
|
09:30 am to 08:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
394,700
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 12/23/22 resulted in the discharge of a combination of sewage and stormwater from CSO #2. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPQ-5AND-1VDZC
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|