Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Dr. PS CSO#002
|
|
|
04/09/2022
|
|
|
04/09/2022
|
|
|
03:30 pm to 05:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
19,300
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 4/9/22 resulted in the discharge of a combination of sewage and stormwater from CSO#002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPG-TZJ2-ECWW0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|