Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput, Chief Operator    
Vergennes    
Macdonough Dr. PS Overflow structure #002    
02/18/2022    
02/18/2022    
01:45 am to 05:15 am    
   
Authorized Wet Weather CSO Overflow    
83,800    
High Flows    
Rain and Snow melt overwhelmed the pump    
Combined sewer overflow structure    
None    
Otter Creek    
Rick Chaput, Chief Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 2/18/22 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPF-JXCJ-GD5YT