Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Dr. PS Overflow structure #002
|
|
|
02/18/2022
|
|
|
02/18/2022
|
|
|
01:45 am to 05:15 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
83,800
|
|
|
High Flows
|
|
|
Rain and Snow melt overwhelmed the pump
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 2/18/22 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPF-JXCJ-GD5YT
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|