Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput, Chief Operator    
City of Vergennes    
Macdonough Dr. overflow structure #002    
11/13/2021    
11/13/2021    
04:15 pm to 10:00 pm    
   
Authorized Wet Weather CSO Overflow    
228,000 gallons    
High Flows    
   
Combined sewer overflow structure    
None    
Otter Creek    
Rick Chaput, Chief Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 11/13/21 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPD-7GQ0-4J79Y