Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Drive Overflow Structure
|
|
|
08/19/2021
|
|
|
08/19/2021
|
|
|
06:00 pm to 11:59 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
125,900
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek below the falls in Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8/19/21 resulted in the discharge of a combination of sewage and stormwater from CSO#002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|