Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Dr. overflow structure
|
|
|
07/20/2021
|
|
|
07/21/2021
|
|
|
07:30 pm to 01:45 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
323,000 gal
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/20/21 resulted in the discharge of a combination of sewage and stormwater from CSO #002 at the Macdonough Dr. lift station. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
1.5 inches of rain fell in under an hour.
|
|
|
|
|
|
HPA-C8FC-4TAGV
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|