Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Drive lift station overflow structure
|
|
|
07/18/2021
|
|
|
07/18/2021
|
|
|
09:15 am to 02:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
157,400
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otther Creek below the falls in Vergenne
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/18/21 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
Rain total 1.58inches
|
|
|
|
|
|