View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput, Chief Operator    
City of Vergennes    
Macdonough Drive lift station overflow structure    
07/18/2021    
07/18/2021    
09:15 am to 02:00 pm    
   
Authorized Wet Weather CSO Overflow    
157,400    
High Flows    
   
Combined sewer overflow structure    
None    
Otther Creek below the falls in Vergenne    
Rick Chaput, Chief Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 7/18/21 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Rain total 1.58inches    
   