Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Dr. Pump Station metered overflow structure
|
|
|
08/04/2020
|
|
|
08/04/2020
|
|
|
07:40 pm to 09:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
37,800
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek belowt the falls in Vergenne
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on August 4th 2020 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|