Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput, Chief Operator    
City of Vergennes    
Macdonough Drive Pump Station CSO#002    
10/31/2019    
11/01/2019    
09:30 pm to 05:30 pm    
   
Authorized Wet Weather CSO Overflow    
530,500    
High Flows    
   
Combined sewer overflow structure    
None    
Otter Creek below the falls in Vergennes    
Rick Chaput, Chief Operator    
   
   
nForms    
Y    
   
   
   
3 inches of rain has fallen in 12 hours High flows caused by an intense rain storm on October 31, 2019 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HNT-YS6M-WMV73