|
Facility Name:
|
Vergennes
|
|
|
victor chaput sr
|
|
|
city of vergennes
|
|
|
cso overflow structure macdonough drive
|
|
|
10/07/2019
|
|
|
10/07/2019
|
|
|
10:45 am to 12:45 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
otter creek
|
|
|
Victor Chaput sr/Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 10/7/19 resulted in the discharge of a combination of sewage and storm water from CSO overflow structure Macdonough drive pump station. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNT-B871-WVEN6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|