|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Otter Creek
|
|
|
02/05/2019
|
|
|
02/05/2019
|
|
|
12:00 pm to 04:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
79,800
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek below the falls Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by intense snowmelt on 2/5/2019 resulted in the discharge of a combination of sewage and runoff from CSO 002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNM-BKP5-A962K
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|