Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Dr. Pump Station CSO #002
|
|
|
01/24/2019
|
|
|
01/24/2019
|
|
|
03:00 pm to 11:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
167,900
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
.95" of rain between 5:00am and 7:00pm
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on January 24, 2019 resulted in the discharge of a combination of sewage and stormwater from CSO#002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNM-2789-6D157
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|